Projects

Partial List of Projects  

Year Project Contract Amount
     
2014 SFWMD S-5AS Divide Structure Improvements $2,284,000
2014 Ibis Isle Bulkhead $174,000
2014 City of West Palm Beach Osprey Park Bulkhead $227,000
2014 Palm Beach County Winding Waters Boardwalks $350,000
2014 Preserve at Juno Beach Boardwalk $175,000
2014 Palm Beach County Jupiter Flatwoods Boardwalks $356,000
2014 Seawinds Condominium Seawall $2,207,000
2014 Eastpointe I and One Singer Island Seawalls $1,195,000
2014 City of West Palm Beach Control Structure No. 2 Pump Station $5,300,000
2013 Corniche Condominium Seawall $2,170,000
2013 Army Corps. of Engineers S319 Trash Raker Replacement $5,000,000
2013 Seminole Seawall $1,490,000
2013 Preserve at Juno Beach Retaining Walls $1,326,000
2013 Town of Palm Beach Ejector Pump Stations $4,360,000
2013 Lake Worth Intracoastal Waterway Bulkhead $247,000
2013 NPBCID PGA National North Stormwater Pump Station $681,000
2013 Town of Palm Beach A39, A41, A42 & A43 Pump Stations $1,050,000
2013 Lake Worth Drainage District Control Structure No. 3 $549,000
2013 Manalapan Seawalls $1,635,000
2012 Manalapan Seawalls $1,295,000
2012 West Palm Beach Clear Lake Pump Station and Divide Structure $5,139,000
2012 Town of Palm Beach Seawall $1,032,000
2012 Town of Palm Beach D6 and D7 Stormwater Pump Stations $1,505,000
2012 NPBCID PGA National South Stormwater Pump Station $1,415,000
2012 Manalapan Pedestrian Tunnel $480,000
2012 GL Homes Atlantic Commons Bridge $765,000
2012 Manalapan Seawall $328,000
2012 Town of Palm Beach Seawall $903,000
2011 Army Corps. of Engineers S362 Trash Raker $4,343,000
2011 Palm Beach County L-2 Stormwater Pump Station $3,297,000
2011 Sunshine WCD Pump Station No. 1 and No. 2 $3,935,000
2011 Lantana Seawall Phase II $231,000
2011 Town of Palm Beach Seawall $621,000
2011 City of Sunrise Pump Station No. 7 $444,000
2011 Frenchman’s Harbor Bulkheads, Bridges and Docks $11,000,000
2010 Juno Dunes Natural Area Marina, Docks and Boardwalk $2,160,000
2010 Lost Tree Village Bulkhead, Shoring and Excavation $2,536,000
2010 Town of Palm Beach D-9 Stormwater Pump Station $1,260,000
2010 Harbor House Seawall $363,000
2009 City of West Palm Beach Control Structure No. 4 $1,367,000
2009 Imperial House Seawall $463,000
2009 Mayfair House Seawall $1,100,000
2009 Town of Palm Beach Sand Transfer Plant “Pump House” $2,643,000
2009 NSLRWCD Five Mile Creek Revetment $2,257,000
2009 NSLRWCD Header Canal Revetment $5,037,000
2009 Village of Wellington Pump Station No. 9 $3,114,000
2009 Town of Lantana Seawall Phase I $678,000
2008 SFWMD G-92 Water Control Structure $1,511,000
2008 LWDD Weaver Canal Revetment $2,760,000
2008 City of West Palm Beach Waterfront Docks $738,000
2008 City of Weston Pump Station No. 1 and 2 $3,800,000
2008 Spring Lake Pump Station Emergency Repairs $281,000
2008 Claridge Condominium Seawall $443,000
2008 Jupiter Beach Seawall $132,000
2008 OUA Raw Water Pump Station $234,000
2007 Manalapan Pedestrian Tunnel $1,061,000
2007 The Reaches Condominium Seawall $814,000
2007 The Village of Wellington Pump Station No. 7 $3,780,000
2007 Town of Palm Beach North Ocean Blvd. Revetment $2,048,000
2007 Palm Beach County Dubois Park Lagoon Retaining Walls $295,000
2007 Palm Beach County Connors Highway Revetment $454,000
2007 Marine Life Center Ocean Water Supply Pump Station $754,000
2007 City of West Palm Beach Flagler Drive Bulkhead $4,789,000
2007 Okeechobee PUD Lift Station $178,000
2007 Town of Palm Beach D-2 Stormwater Pump Station $998,000
2007 Town of Jupiter Stormwater Pump Station $1,825,000
2006 Village of Wellington Pump Station No. 8 $1,637,000
2006 Vero Beach Sea Oaks Condominium Seawall $980,000
2006 St. Johns WCD Sebastian Stormwater Pump Station $450,000
2006 Connemara/Seadunes Condominium Seawall $928,000
2005 Village of Wellington Pump Station No. 4 $1,292,000
2005 Town of Palm Beach D-8 Pump Station $1,174,000
2005 Palm Beach County Phil Foster Park Bulkhead $1,132,000
2004 SFWMD G-341 Spillway $2,382,000
2004 Village of Wellington Pump Station No. 3 $983,000
2004 Town of Palm Beach Old Ocean Blvd. Seawall $479,000
2004 Traditions Sanitary Lift Station $1,005,000
2004 Brazilian Court Sewer, Water, Drainage and Roadway $300,000
2003 SIRWCD Water Control Structures $1,189,000
2003 City of West Palm Beach Dreher Park Lakes and Pump Station $876,000
2003 LWDD Control Structure No. 4 Pump Addition $306,250
2003 Palm Beach County Sanitary Sewer Lift Stations $2,228,000
2003 Village of Wellington Pump Station No. 6 $1,068,000
2002 City of West Palm Beach M Canal Siphon Structure $360,000
2002 SFWMD STA 2 Seepage Pump Station $1,278,000
2002 SFWMD S-31 Culverts $825,000
2002 Town of Palm Beach Utility Work $584,000